YтАУDB CHAMBERS FIELD MAGAZINE CONSTRUCTION, PHASE I, NAVAL STATION NORFOLK, VA

Type of document: Contract Notice
Country: United States

YтАУDB CHAMBERS FIELD MAGAZINE CONSTRUCTION, PHASE I, NAVAL STATION NORFOLK, VA

Agency:
Department of the Navy

Official Address:
N40085 NAVFAC Mid-Atlantic Naval Facilities Engineering Command, Mid-Atlantic Code AQ, 9742 Maryland Avenue Norfolk, VA

Zip Code:
23511

Contact:
Vivienne Moore 757-341-1967 Vivienne Moore
Vivienne.moore@navy.mil
757-341-1967

Link:

Date Posted:
04/06/2017

Classification:
Y

Contract Description:
PRE-SOLICITATION NOTICE
This is neither a request for quote or proposal nor an invitation for bid. The intent of this pre-solicitation synopsis is to inform potential offerors of this requirement.
The Request for Proposal (RFP) will be issued by NAVFAC Mid-Atlantic Hampton Roads IPT on or about June 22, 2017. The solicitation number will be N40085-17-R-0332 on the Navy Electronic Commerce Online website (NECO) at A Vendor User Guide is available for download at the site as well as the NECO Help Desk contact phone number for any issues/questions related to the website. Ensure that you register with the site so you will receive emails applicable to this solicitation in the event of any amendments and/or any changes regarding this solicitation and/or solicitation of interest.
Primary POC: Vivienne Moore, (757) 341-1967, email: vivienne.moore@navy.mil.
A sources sought notice was posted on February 10, 2017 under synopsis N40085-17-R-0332 to determine availability and capability of small businesses to perform the requirement. Based on market research results, the procurement will be solicited on an unrestricted basis with full and open competition. NAVFAC Mid-Atlanticя┐╜я┐╜я┐╜s Office of Small Business Programs concurs with the determination to solicit as an unrestricted procurement.
Project Description:
The proposed project includes the following:
Design and construction project of one Type-C (three bay) Magazine (10,053 SF) and one Type-D (five bay) Magazine (16,533 SF), an Ordnance Operations Building (7,804 SF), an Inert Storage Facility (16,996 SF), an Ordnance Build-up/Assembly Facility (1,195 SF) and Woodworking Shop Facility (4,370 SF).

All will be constructed of metal or masonry walls with metal roof on concrete slabs. This project will provide Anti-Terrorism/Force Protection (AT/FP) features and comply with AT/FP regulations and physical security mitigation in accordance with DoD Minimum Anti-Terrorism Standards for Buildings. Built-in equipment includes dock levelers and exhaust system for the magazines, and uninterruptible power supply for the ordnance operations building.
Project site preparations include removal of contaminated earth, clearing of woods for the ordnance operation building, earthwork throughout the project site and site fill throughout the project site for grading purposes. Paving and Site improvements include roadways, removal of paving and slabs, approximately 60 parking spaces, sidewalks, concrete pads, pavement area, fencing and landscaping.
A gate/sentry house is provided. The fencing will be located around the de-containerizing area and will be chain-linked fence with strand barbed wire. Electrical utilities include underground utility distribution, primary and secondary electrical distributions, lighting, site security alarm, telecommunications infrastructure, transformers and forklift charging stations. Forklift charging stations will be covered and mounted on concrete pads. Mechanical utilities included HVAC, water distribution throughout the project site, fire protection systems and supply lines, elevated water storage tank, sanitary sewer lines and storm drainage piping. The elevated water tank will be located outside of explosive arcs north of the existing elevated water tank.
The project will demolish 13 magazines, woodworking shop facility, open ammunition parking pad, inert storage facility, ordnance operations building, elevated water tank, guard shack to include explosives decontamination and lead and asbestos abatement.
The estimated construction cost is between $25,000,000 and $100,000,000.
The anticipated award of this contract is March 2018.
The completion time for this contract is 845 calendar days after award.
The specifications for this project will be posted with the solicitation and are not available at this time.
The North American Industry Classification System (NAICS) Code for this project is 236220, Commercial and Institutional Building Construction with a small business size standard of $36.5 million.

Sol Number:
N4008517R0332

 

Who are we?

From publishing the first national directory of public sector contracts, to being the first to market with our online Tracker solution, we have been the true pioneers of technology and innovation in the public sector marketplace. Throughout our 39 years, we have continued to evolve and chart new territory тАУ placing our customers at the heart of everything we do. Take your business to the next level with Tracker now.

If you request a demo today!

Download your Free UK Defence Industry Report

Start Your Free Trial Today

Download your Free UK Defence Industry Report

Download your Free UK Defence Industry Report

When you sign up for a 3 day free trial or demo.

Limited time only

    BiP Solutions owns DCI and we look after your details carefully. We offer a range of products, services and events (some of which are free) that help buyers tender more efficiently and suppliers find, bid for and win public and private sector contracts. Only tick this box if you wish to receive information about these. We will never share your details with third parties and you will have the opportunity of opting out of communications every time we contact you. For further details, please see our Privacy Policy